[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Gen:Gann Square



PureBytes Links

Trading Reference Links

A Gann Square can be easily constructed in excel. The file I have
attached measures the OEX from a low of 454.92 to the recent high of
735.86. It took 282 days (I include weekends) for the OEX to reach 733.80
on Fri. 7/16/99 (on monday 7/19/99 the OEX reached a high of 735.86). The
square for this number of days was 735.92. I have highlighted these
numbers on the two squares. This is what my father used to refer to as
"Close enough for government work"

Ron McEwan

 
Attachment Converted: "c:\eudora\attach\GannII.xls"