Could you Take a look, is it possible to have the code check where the
trough and peak are in relation to (x), which is always the starting
point , as you can see, if I have RANKt and RANKp set at equal
variables. the code starts a (a) instead of (x).
Anthony
Attachment:
Description: ""
Attachment:
Description: ""
Attachment:
Description: ""
Attachment:
Description: ""
Attachment:
Description: ""
|